Project Owner & Contact:

Ashford oaks surgical center

Contact:  

 

Completion Date         Construction Volume
December 2017          $707,977.00
Project Details:
Frontera Construction was selected by private contract to complete a last-minute tenant finish out of an existing space that had been mishandled by another General Contractor. The two suites are a surgical center and recovery center for day surgery patients. The project is within a 11-story facility in the Medical Center are of San Antonio. The total square footage is 3,560. The work required the installation of a 30-ton chiller system with HEPA filtered air to the surgery rooms. It has a large amount of medical gas that had to be installed in the existing facility along with a complete duplicate power system run by a backup generator. The facility had to pass a rigid Texas Department of Health inspection while being opened under a restricted time frame. The electrical system and HVAC system were all new, while also remodeling the floor and wall finishes and replacing the doors and ceiling system.
 
Project Team
Architect
Clifton D. Thomason

 

  Dec 8, 2017   admin


Category
Healthcare